Aerial view of the Calcasieu Pass facility

LOUISIANA BASED. GLOBALLY EXPERIENCED.

Powerful processes.
Precise control.

BOP controls, DCS commissioning and PID tuning for power generation. Bringing 19 years of international field experience to your next project.

POWER GENERATION / WATER–STEAM PROCESSES

19Years of experience
2007–2026An international career
USAServices nationwide

HANDS-ON EXPERIENCE WITH

GE MarkVIeSIEMENS SPPA-T3000ABB 800xA

01 / WHAT WE DO

From the logic
to the plant.

Practical support grounded in how the process actually behaves. From control definition and system integration to commissioning and operation.

01

BOP process controls

Control logic, sequences and process integration for balance of plant (BOP) systems, with a focus on combined cycle water–steam processes.

  • HRSG & feedwater
  • Steam & bypass
  • Condensate & cooling
Talk about this service
02

DCS & commissioning

On-site distributed control system (DCS) support: loop checks, functional tests, logic and HMI modifications, start-up and operational troubleshooting.

  • GE MarkVIe
  • Siemens SPPA-T3000
  • ABB 800xA
Talk about this service
03

Technical consulting

An experienced perspective on control philosophy, process interactions and difficult plant issues. Technical reviews and practical recommendations for your team.

  • Logic reviews
  • Process diagnosis
  • Integration support
Talk about this service
04

PID tuning.
A better process response.

Proportional–integral–derivative (PID) loop analysis and tuning to address oscillation, response and interaction. Changes coordinated with plant operations and documented against available trends.

  • Loop stability
  • Transient response
  • Water–steam control
Talk about this service
Process responseSetpoint

Illustrative control response · not measured project results

05

Control panels.
From specification to start-up.

Custom electrical and control panel supply, technical coordination, installation support and commissioning. One point of contact to bring the panel into the process.

  • Custom panel supply
  • Installation support
  • Site commissioning
Talk about this service Electrical control cabinets

02 / A CAREER IN THE FIELD

A world of projects.
One continuous journey.

Explore David’s project experience, from control documentation in 2007 to power generation supporting LNG facilities in Louisiana.

Career information updated October 2026

View the full project chronology

All stages, in chronological order.

2007Hadjret en NoussAlgeria

I&C Engineer · Control design

Project in Algeria

  • Developed control logic diagrams and process graphics.
  • Prepared wiring and instrument hook-up diagrams.

Technical contribution: Translated process and instrumentation requirements into control documentation for the combined-cycle project.

Project country reference. This design assignment does not establish on-site presence.

2007LaresPortugal

I&C Engineer · Control design

Project in Portugal

  • Prepared logic diagrams, process graphics and wiring diagrams.
  • Developed specifications and transmitter/valve datasheets; coordinated technical follow-up.

Technical contribution: Connected process requirements, instrument selection and control documentation during the engineering stage.

Project country reference. This design assignment does not establish on-site presence.

2007BraziRomania

I&C Engineer · Control design

Project in Romania

  • Developed I&C logic diagrams and specifications.
  • Attended customer coordination meetings and followed up engineering actions.

Technical contribution: Supported the definition and coordination of the plant control requirements before commissioning.

Project country reference. This design assignment does not establish on-site presence.

2007Deir AliSyria

I&C Engineer · Control design

Project in Syria

  • Prepared transmitter and valve datasheets for the combined-cycle project.

Technical contribution: Specified field instrumentation requirements as part of the plant engineering scope.

Project country reference. This design assignment does not establish on-site presence.

2008Lares · FATUnited States

I&C Engineer · Factory acceptance testing

Salem, Virginia

  • Participated in the Lares factory acceptance tests in Salem.

Technical contribution: Brought project control knowledge to the factory acceptance testing stage.

Documented milestone: Factory acceptance testing participation, 2008.

Approximate location of the factory acceptance testing, not the Lares plant.

2009–2010 (June 2009–February 2010)LaresPortugal

I&C Test Supervisor / Process Engineer · Commissioning

Portugal

GE MarkVIe

  • Modified control logic and supervised I&C site acceptance tests.
  • Supported BOP commissioning and operators; maintained as-built diagrams and instrument datasheets.

Technical contribution: Combined field process support with control logic and documentation during plant commissioning.

Country reference only; the precise project location is not confirmed.

2010 (April–October)Besós 5Spain

I&C Test Supervisor / Process Engineer · Commissioning

Spain

GE MarkVIe

  • Supervised I&C testing and modified BOP control logic.
  • Supported operators during commissioning and prepared as-built logic and instrument specifications.

Technical contribution: Supported plant operation through the commissioning stage while maintaining the control documentation.

Country reference only; the precise project location is not confirmed.

2011 (March–December)BraziRomania

I&C Test Supervisor / Process Engineer · Commissioning

Romania

GE MarkVIe

  • Modified logic, supervised SAT and supported cold/hot BOP commissioning.
  • Supported customer-scope DCS logic, including gas compressor logic; prepared as-built documentation.

Technical contribution: Connected customer control requirements with field testing and BOP start-up activities.

Country reference only; the precise project location is not confirmed.

2012 (February–December)SamsunTürkiye

I&C Test Supervisor / Process Engineer · Commissioning

Samsun, Türkiye

Metso

  • Supervised tests and logic changes for feedwater, condensate, ESD, cooling water and plant auxiliaries.
  • Supported cold/hot commissioning, operator training and as-built logic documentation.

Technical contribution: Brought process and control support across the water, steam and auxiliary systems during start-up.

Approximate city reference; not the exact plant location.

2013 (January–August)DenizliTürkiye

DCS Control Engineer / I&C Test Supervisor · Commissioning

Denizli, Türkiye

Siemens SPPA-T3000

  • Modified and tested HRSG, feedwater, steam/bypass, condensate and auxiliary-system logic.
  • Supported BOP commissioning, ESD changes and operator training; took responsibility for NEM HRSG logic.

Technical contribution: Provided an integrated process and control view of the HRSG and its connected BOP systems.

Approximate city reference; not the exact plant location.

2013–2014 (August 2013–May 2014)S3 ShuweihatUnited Arab Emirates

BOP I&C Commissioning Manager / Lead DCS Engineer · Commissioning

United Arab Emirates

Siemens SPPA-T3000

  • Supervised I&C activities, loop checks, schedules and coordination with consortium and client.
  • Supervised SAT and HRSG protection, feedwater, condensate and auxiliary steam tests.

Technical contribution: Coordinated the control perspective of BOP testing, commissioning and operating support.

Country reference only; the precise project location is not confirmed.

2014–2016 (June 2014–June 2016)PP10Saudi Arabia

Lead DCS Engineer / TOC Responsible Engineer · Commissioning

Riyadh, Saudi Arabia

GE MarkVIe

  • Led DCS activities and a team of four engineers from construction through commissioning.
  • Managed energization, SAT, logic modifications and PID tuning for BOP, HRSG and HP/LP steam/bypass systems.

Technical contribution: Carried control responsibilities across the construction-to-start-up transition and coordinated completion testing with the client.

Documented milestone: Control scope continued through steam turbine synchronization and base load, as recorded in the CV.

Approximate city reference; not the exact plant location.

2016 (June–December)Chilca PlusPeru

Lead T3000 DCS Engineer · Commissioning

Lima reference, Peru

Siemens SPPA-T3000

  • Programmed logic and process graphics; performed BOP, HRSG, steam/bypass and plant autosequence SAT.
  • Performed hot loop checks, supported steam blows and diagnosed hardware, software and safety-controller issues.

Technical contribution: Connected logic review, field testing and operator support during commissioning of integrated BOP systems.

Approximate city reference; not the exact plant location.

2016–2017 (December 2016–February 2017)Baja California IIIMexico

MarkVIe DCS Engineer · Commissioning

Ensenada, Mexico

GE MarkVIe

  • Programmed logic and process graphics and performed final BOP tests, including HRSG, steam and bypass.
  • Supported plant operation and tuned PID loops.

Technical contribution: Combined final functional testing with control adjustments and operating support.

Documented milestone: Participation in final BOP tests, including base-load rejection testing.

Approximate city reference; not the exact plant location.

2017 (February)Nehuenco IIChile

I&C Engineer · DCS & process support

Quillota, Chile

Alstom DCS

  • Investigated remaining BOP issues following a gas-turbine combustion upgrade.

Technical contribution: Provided targeted BOP troubleshooting after the gas-turbine upgrade during a 15-day assignment.

Approximate city reference; not the exact plant location.

2017 (February–May)YPF-2Argentina

I&C Engineer · Commissioning

Argentina

GE MarkVIe

  • Powered up BOP MarkVIe cabinets.
  • Diagnosed and corrected I&C wiring issues.

Technical contribution: Supported the field readiness of BOP control hardware and wiring.

Country reference only; the precise project location is not confirmed.

2017–2018 (May 2017–April 2018)CVOArgentina

Lead DCS Engineer · Commissioning

Rosario reference, Argentina

GE MarkVIe

  • Performed loop checks, troubleshooting and logic modifications across plant systems.
  • Worked on HRSG protections, bypass, plant autosequence and BOP PID tuning.

Technical contribution: Integrated control troubleshooting and loop tuning across HRSG and plant-level BOP sequences.

Approximate city reference; not the exact plant location.

2018 (April–August)Sewaren 7United States

Lead DCS Engineer · Commissioning

New Jersey, United States

GE MarkVIe

  • Prepared control logic from steam blows through commercial operation.
  • Tuned HRSG, bypass and attemperation PID loops.

Technical contribution: Linked the commissioning control logic with the steam-system operating requirements.

Documented milestone: Logic preparation from steam blows through commercial operation, according to the CV.

Approximate regional reference; not the exact plant location.

2018 (August–December)BirdsboroUnited States

Lead DCS Engineer · Commissioning

Birdsboro reference, United States

GE MarkVIe

  • Prepared control logic for steam blows, including HRSG and bypass systems.

Technical contribution: Adapted the HRSG and bypass control logic for the steam-blow commissioning stage.

Approximate city reference; not the exact plant location.

2019 (January–April)FairViewUnited States

Lead DCS Engineer · Commissioning

Pennsylvania, United States

GE MarkVIe

  • Set up DCS servers, printers, Toolbox and operator screens.
  • Powered up BOP MarkVIe cabinets and performed loop checks.

Technical contribution: Supported DCS infrastructure and field-loop readiness ahead of the plant commissioning activities.

Approximate regional reference; not the exact plant location.

2019 (June–September)El BrachoArgentina

DCS Engineer · DCS & process support

Argentina

GE MarkVIe

  • Troubleshot serial communications, field loops, HMI screens and control logic.

Technical contribution: Provided focused diagnostics across the communications, operator-interface and control layers.

Country reference only; the precise project location is not confirmed.

2019 (September–October)Alon TavorIsrael

I&C / DCS Engineer · DCS & process support

Israel

Siemens SPPA-T3000

  • Supported the plant performance tests from the I&C and T3000 control perspective.

Technical contribution: Provided control-system support to the performance-testing team.

Country reference only; the precise project location is not confirmed.

2019 (September–December)Old HarbourJamaica

Lead DCS Engineer · DCS & process support

Old Harbour reference, Jamaica

GE MarkVIe

  • Corrected control logic and tuned HRSG and BOP loops for reliability and performance tests.

Technical contribution: Combined logic corrections and process-loop tuning in preparation for plant testing.

Approximate city reference; not the exact plant location.

2019–2021 (December 2019–March 2021)EVM IIMexico

Lead DCS Engineer · Commissioning

Mexico

GE MarkVIe

  • Supported start-up of BOP, water/steam and HRSG systems and corrected system logic.
  • Tuned PID loops and modified HMI and control logic.

Technical contribution: Brought process knowledge and control changes together across the BOP start-up scope.

Country reference only; the precise project location is not confirmed.

2021–2022 (August 2021–February 2022)GuernseyUnited States

Lead DCS Engineer · Commissioning

United States

GE MarkVIe

  • Powered up DCS cabinets, performed loop checks and commissioned cooling, waste, service and demineralized water systems.
  • Established Modbus communications with grid and electrical systems.

Technical contribution: Supported both water-system commissioning and integration of electrical communications.

Country reference only; the precise project location is not confirmed.

2022 (February–August)Calcasieu PassUnited States

Lead DCS / Process Engineer · DCS & process support

Cameron Parish, Louisiana

GE MarkVIe

  • Reviewed HRSG protections and feedwater, condensate, bypass and BOP control requirements.
  • Tuned PIDs, modified logic/HMI and supported process analysis for LNG power generation.

Technical contribution: Connected HRSG protection, water/steam controls and process troubleshooting in a power island serving an LNG facility.

Approximate regional reference; not the exact plant location.

2022–2023 (November 2022–February 2023)Orot RabinIsrael

I&C / DCS Engineer · Commissioning

Israel

GE MarkVIe

  • Supported loop checks and HMI modifications.
  • Reviewed P&IDs and supported field-instrument installation.

Technical contribution: Connected field instrumentation, process drawings and the operator interface during commissioning.

Country reference only; the precise project location is not confirmed.

2023–2024 (February 2023–October 2024)Bridge PowerGhana

Lead DCS / Process Engineer · DCS & process support

Accra reference, Ghana

ABB 800xA

  • Reviewed HRSG protections and BOP feedwater, condensate, bypass and HRSG processes.
  • Tuned PIDs and modified logic and HMI using process and thermodynamic analysis.

Technical contribution: Applied process knowledge to protection reviews, control-loop tuning and DCS changes on ABB 800xA.

Approximate city reference; not the exact plant location.

2024 (October–December)SalamancaMexico

HRSG Process / DCS Engineer & Consultant · DCS & process support

Salamanca reference, Mexico · 927 MW

Siemens SPPA-T3000

  • Reviewed HRSG engineering and developed revised control logic for use on further projects in Mexico.
  • Tuned PIDs and modified HMI and logic.

Technical contribution: Developed HRSG control changes that were subsequently carried into the SLP implementation.

Documented milestone: Development of the HRSG logic subsequently implemented in SLP.

Approximate city reference; not the exact plant location.

2024–2025 (December 2024–February 2025)SLPMexico

HRSG Process / DCS Engineer & Integrator · DCS & process support

San Luis Potosí reference, Mexico · 490 MW

Siemens SPPA-T3000

  • Implemented the HRSG logic developed in Salamanca.
  • Tuned PID loops and modified logic and HMI with process analysis.

Technical contribution: Adapted and implemented the prior HRSG control work in the SLP project.

Documented milestone: Implementation of the HRSG logic carried forward from Salamanca.

Approximate city reference; not the exact plant location.

2025 (February–December)MéridaMexico

HRSG Process / DCS Engineer & Integrator · DCS & process support

Mérida reference, Mexico

Siemens SPPA-T3000

  • Implemented HRSG logic carried forward from SLP and tuned PID loops.
  • Modified logic and HMI while working in parallel on Mérida and Valladolid, travelling between both projects.

Technical contribution: Carried the HRSG integration approach into Mérida while supporting two concurrent project sites.

Approximate city reference; not the exact plant location.

2025 (February–December)ValladolidMexico

HRSG Process / DCS Engineer & Integrator · DCS & process support

Valladolid reference, Mexico

Siemens SPPA-T3000

  • Implemented HRSG logic carried forward from SLP and tuned PID loops.
  • Modified logic and HMI while working in parallel on Valladolid and Mérida, travelling between both projects.

Technical contribution: Supported HRSG process/control integration at Valladolid alongside the concurrent Mérida assignment.

Approximate city reference; not the exact plant location.

2025–present (since December 2025)PlaqueminesUnited States

Lead MarkVIe DCS / Process Engineer & PID Tuner · DCS & process support

Plaquemines Parish, Louisiana · 700 MW / phase

GE MarkVIe

  • Tunes PID controllers and modifies logic and HMI screens.
  • Troubleshoots BOP processes and works on start-up/HRSG coupling optimization; assignment ongoing as confirmed in October 2026.

Technical contribution: Connects thermodynamic and process analysis with DCS changes and loop tuning in a power island serving LNG production.

Approximate regional reference; not the exact plant location.

Projects reflect the founder’s professional experience, including work through contracting companies. They are not presented as contracts delivered by WST.

David Salmeron SegoviaDAVID SALMERON SEGOVIA
WST PROCESS CONTROLS LLC

03 / THE PERSON BEHIND WST

A process mindset.
A field perspective.

David Salmeron Segovia

Industrial Engineer · Process Control Specialist

My career has taken me from I&C design and factory testing to leading DCS and commissioning activities on power generation projects around the world. I connect control logic with the thermodynamics and operating realities behind it.

WST Process Controls LLC brings that experience to BOP controls, water–steam processes and plant commissioning across the United States, with a base in Louisiana.

Industrial Engineering, Universidad Politécnica de Madrid (2006), with additional training in combined cycle power plants.

  • Combined cycle & HRSG
  • Water–steam processes
  • Control logic & HMI
  • Commissioning & PID tuning
Professional licensure in progress

Professional engineering licensure is in progress. Service scope is defined according to applicable professional licensing requirements.

04 / LET’S TALK

Your next challenge.
Let’s bring it under control.

Tell us about your plant, your process or the control issue you need to resolve.

Based in Louisiana · Serving the USA

Please do not include confidential plant information.

Your details are used to respond to your inquiry. Privacy notice

Privacy notice

WST Process Controls LLC uses the name, email, message and optional project details you submit to respond to your inquiry. Please avoid confidential or sensitive plant information. Form delivery may use the hosting and email services configured for this website. Access is limited to handling your request; information is retained only as needed for correspondence and applicable obligations. You can request access, correction or deletion by emailing [email protected]. This website does not enable advertising cookies or analytics. Technical abuse protection may temporarily process connection information. Contact details remain available if you prefer email or telephone.

Platforms used throughout the founder’s career. Names identify their respective owners.